VersaTube VS3406014420WS Instruction Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
STEP 2: POSITIONING AND ANCHORING THE SIDE POST/ HEIGHT EXTENSIONS ON THE
SLAB
The outside of each post should be set 1 1/2” from the edge of the sheeting ledge. This is the space provided for the 1 1/2”
high hat channel girts. The corner post should be flush with the sheeting ledge. (If you are using hat channel for the end
wall girts the corner post will be 1 1/2” from the sheeting ledge.) The anchor portion of the base plate is turned toward the
inside of the building as shown. All of the additional side posts will face the same direction unless it is necessary to turn
them the other direction at a door opening. The corner post at the other end of the building will be turned back to the inside
of the building.
The base plates will be attached to the slab with 5/8” x 5” concrete wedge anchors. Position the side post assembly, mark
the location for the anchor bolt, remove the side post assembly. Using a 5/8” concrete drill bit in a hammer drill, drill a hole
in the slab 5 1/2” deep. Place the flat washer on the anchor bolt and thread the hex nut on to the bolt until about 2 threads
show above the nut. Place the side post assembly back in place, insert the anchor bolt into the hole an tap it in with a ham-
mer. Tighten the nut. You must then plumb the post side to side and front to back and brace the post in place with a diago-
nal brace to a stake in the ground on the outside of the building. A wood 2x4 or additional pieces of hat channel can be
used as braces.
1 1/2”
EDGE OF
SHEETING LEDGE
CORNER SIDE POST
BASE PLATE EXTENDS 1/4”
OVER SHEETING LEDGE EDGE
CORNER POST
46”, 58” or 70”
BETWEEN POSTS
INSTALLING ADDITIONAL SIDE POSTS
Position and anchor all additional side
posts as you did the corner post on 4’, 5’
or 6’ centers using the post locating marks
you put on the slab. Install at least two
runs of hat channel girts down the wall.
This will line up and hold the posts plumb
and properly spaced at 4’, 5’ or 6’ centers.
Hint: You may want to cut a spacer board
to set the space between post as you in-
stall hat channel girts. The first or lower
run of hat channel is 2” from the slab. You
can use 2x3 or 2x4 tubes laid on their side
as a spacer under the lower edge of the
hat channel. The ends of the hat channel
should fall in the center of a side post.
Attach the hat channel with #12 x 3/4”
self-drilling screws. Add additional diago-
nal braces as needed down the length of
the building.
All bottom runs of hat channel are 2” from
the slab. The on center spacing of hat
channel runs on different eave height
buildings will be different.
On 10’ buildings: 38” on center.
On 12’ buildings: 46” on center.
On 14’ buildings: 40 1/2” on center.
On 16’ buildings: 46 1/2” on center.
PAGE 8
1”
END OF HAT
CHANNEL
CENTERED IN
FRAME
BUTT ENDS OF HAT
CHANNEL TOGETHER
CENTERED IN FRAME
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 45 46

Comments to this Manuals

No comments