VersaTube VS3406014420WS Instruction Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
INSTALLING A WALK DOOR FRAME IN SIDE OF BUILDING WITH BASE RAILS
We recommend that you cut out the base rail where walk doors will be located. Cut out a section of base rail wide enough
to fit your pre-hung door frame into the opening (frame width + 3/8”). Measure the height of your pre-hung door frame and
cut a vertical door jamb post 2” shorter than the door frame height. This post will be mounted on top of the base rail and to
the bottom of the door header. (You should have a 2” x 4” x 81 3/4” from which to cut this door jamb post) In your kit you
will have a door header 2” x 4” x 46”, 58” or 70” depending on the on center spacing of your side posts.
Pre assemble these components as shown below and place them in the chosen space between to side posts. The door
frame assembly should be flush with the building frame. The header will be attached to the side posts with BK-10 angle
brackets and the bottom of the vertical door jamb post will be attached to the inside of the base rail with a BK-20 flat
bracket. Make sure the door jamb post is flush and plumb. Use #12 x 3/4” self-drilling screws.
VERTICAL DOOR JAMB
POST CUT 2” SHORTER
THAN PRE-HUNG DOOR
FRAME
PRE-HUNG DOOR
FRAME PLUS 3/8”
Remove hat channel girts
that cross the door open-
ing. You will re-measure
and cut them to fit after the
door nailers have been
installed. This will include
the base hat channel.
THE OPENING BETWEEN THE DOOR
JAMB POST AND THE SIDE POST IS THE
PRE-HUNG DOOR FRAME PLUS 3/8”
1/4” EXTENSION
WITH WELD
PAGE 20
2” OVERHANG
CUT OUT BASE RAIL
BK-20 FLAT BRACKET
BK-10 ANGLE
BRACKET, 3 PLACES
Height with and
without base rail
BK-10 ANGLE
BRACKET
#12 SELF-DRILLING SCREW
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 45 46

Comments to this Manuals

No comments