VersaTube VS3406014420WS Instruction Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
#12 SELF-DRILLING SCREW
PAGE 16
CLAMP
MOTOR CYCLE
STRAP
STRING
SIDE POST
STEP 6: CHECKING THE EAVES FOR HEIGHT AND PLUMBING THE SIDE POSTS
When all of the eave corners have been installed you must check the height of all of the eaves to make sure that they are
at the same height. Run a string line down the length of the building at the eave corner. This will show you if any of the
eaves are not the right height or the side posts are not plumb. Make adjustments to the truss height and the frame and
install (4) #12 x 3/4” self-drilling screws in each swage joint.
4 SCREWS IN EACH
JOINT
A SCREW DRIVEN INTO THE CORNER OF THE CORNER
BRACKET CAN PROVIDE AN ANCHOR FOR YOUR STRING LINE.
You can use motor cycle straps and clamps to pull the frames into
plumb. When the hat channel purlins are installed at the roof eave
corner and the hat channel girt on the side at the eave the frames
will be held in place.
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 45 46

Comments to this Manuals

No comments